The International Building Code (IBC) classifies all buildings into one of five main construction types based on their materials' combustibility and the fire-resistance rating of their structural elements. This classification—Types I, II, III, IV, and V—is a foundational design decision that dictates a building's maximum allowable height and area, influences material selection, and has significant cost implications.

In short, the construction type defines how a building will perform in a fire. The types range from the most fire-resistive (Type I), typically built of non-combustible materials like concrete and steel, to the least fire-resistive (Type V), which is standard wood-frame construction.

  • Types I & II: Composed of non-combustible materials (steel, concrete, masonry). Type I is the most robust, used for high-rises and essential facilities. Type II is common for mid-sized commercial buildings.
  • Type III: A hybrid type featuring non-combustible exterior walls (masonry, concrete) but a combustible interior structure (wood). Often called "ordinary" construction.
  • Type IV: Heavy Timber (HT) construction, which uses large-dimension wood members that char at a slow, predictable rate, providing inherent fire resistance.
  • Type V: The most common type for single-family homes and smaller multi-family buildings, where the entire structure is typically made of wood or other combustible materials.

The designations "A" and "B" further refine these types. "A" stands for "protected," meaning structural elements are required to have an additional layer of fire-resistive protection (like gypsum board or spray-on fireproofing) to achieve a specified hourly rating. "B" means "unprotected," where elements are not required to have an additional fire-resistive coating or covering. For example, a Type II-A building requires its steel frame to be 1-hour rated, while a Type II-B building allows the same steel to be exposed and unrated.

Construction Type General Description Primary Materials Combustibility
Type I (A & B) Fire-Resistive Concrete, Steel Non-Combustible
Type II (A & B) Non-Combustible Concrete, Steel, Masonry Non-Combustible
Type III (A & B) Ordinary Masonry/Concrete Walls, Wood Interior Non-Combustible Exterior, Combustible Interior
Type IV (HT) Heavy Timber Large-Dimension Wood Combustible (Fire-Resistant)
Type V (A & B) Wood Frame Wood Combustible

Understanding these classifications is not just a code-checking exercise; it's a critical early-stage design strategy. The choice of construction type directly impacts the architectural massing, structural system, material specifications, project budget, and the pathway to securing a building permit.

Why Construction Type is a Foundational Design Decision

The IBC's system of construction classification is a cornerstone of fire and life safety regulation. It establishes a baseline for how long a building's structure can be expected to remain stable during a fire, allowing occupants to evacuate safely and first responders to perform their duties. This single decision, typically made during schematic design, has cascading effects throughout the entire project lifecycle.

Architects and engineers must weigh the desired building size (height and area), occupancy group, and project budget against the costs and limitations of each construction type. A developer wanting to maximize the number of units in an apartment building might push the limits of Type V or III construction before having to make the significant cost jump to a Type II or I non-combustible structure. This guide breaks down the key aspects of this decision-making process, from understanding the basic fire-resistance ratings to navigating complex material rules and mixed-construction scenarios.

What this guide covers:

  • Required fire-resistance ratings for each construction type.
  • Strategies for selecting the most cost-effective type for your project.
  • Permitted materials and limitations on combustibles.
  • Special requirements for podium buildings.
  • The specifics of Type IV Heavy Timber construction.
  • How to handle additions to existing buildings.

What are the required fire-resistance ratings for each building construction type under the IBC?

The specific fire-resistance rating requirements for each construction type are dictated by IBC Table 601, "Fire-Resistance Rating Requirements for Building Elements." This table is one of the most fundamental in the code, providing the required hourly ratings for primary structural elements like the structural frame, bearing walls, floors, and roofs.

The primary difference between construction types lies in these required ratings. For example:

  • Type I-A: This is the most robust classification, demanding the highest ratings, typically 3 hours for the structural frame and 2 hours for floors. This is why it's used for high-rises, where structural integrity during a fire is paramount.
  • Type II-A: Requires a 1-hour rating for the frame and floors. Both Type I and II must be built of non-combustible materials.
  • Type II-B: This is "unprotected non-combustible" construction. The materials must be non-combustible (like steel or concrete), but no fire-resistance rating is required for the primary elements. This is a common, cost-effective choice for single-story retail or warehouse buildings.
  • Type V-A vs. V-B: A similar distinction applies to wood-frame construction. In Type V-A, key elements like the structural frame, bearing walls, floors, and roofs must be 1-hour rated. In Type V-B, no ratings are required, which is typical for most single-family homes. The change from V-B to V-A does not mean the entire building becomes 1-hour rated, only the specific elements listed in Table 601.

It's a common misconception that certain materials automatically equal a certain construction type. While a high-rise is typically Type I-A concrete and steel, not all concrete and steel buildings are Type I-A. A single-story warehouse built with an unprotected steel frame and concrete tilt-up walls is a classic example of Type II-B construction. Similarly, a brick building is not automatically Type III; the classification depends on its interior framing. If the interior frame is wood, it's likely Type III. If it's non-combustible, it would be Type II.

Read more about the different construction types here under the IBC

How do I determine the most cost-effective construction type for a building's height, area, and occupancy?

Choosing the most cost-effective construction type is a balancing act between construction costs and development goals, guided by the allowable height and area tables in IBC Chapter 5. The fundamental principle is that more fire-resistive construction types are permitted to be taller and larger.

The process involves a strategic analysis:

  1. Define Project Needs: Start with the desired occupancy group (e.g., R-2 for apartments, B for office), number of stories, and required square footage.
  2. Consult IBC Tables 504.3, 504.4, and 506.2: These tables provide the base allowable height, number of stories, and area per floor for each construction type and occupancy.
  3. Apply Increases: The IBC allows for significant increases to these base numbers if the building is equipped with an automatic sprinkler system (typically NFPA 13) and has sufficient open frontage on public ways or open spaces. An unlimited area building is possible for certain occupancies and construction types (like F-1 in a Type II-B building) if it is fully sprinklered and meets large frontage requirements.
  4. Evaluate Cost Trade-Offs: Analyze the options. For instance, a 4-story R-2 apartment building might be achievable with Type V-A construction, which is generally the most economical. However, if the design requires a fifth story, the project must be upgraded to a more robust type, such as Type III-A. This upgrade involves significant changes: exterior walls may need to be non-combustible, and the required fire-resistance ratings for the structure increase, adding cost. The economic sweet spot for many mid-rise multi-family projects is often Type V-A or III-A wood construction over a concrete podium, as it maximizes density while controlling costs compared to an all-steel or concrete structure.

The "cheapest" construction type is almost always Type V-B, but it is also the most restricted in size. The goal is not to find the absolute cheapest type, but the most economical one that legally meets the project's size and use requirements.

Read more about how to determine the most cost-effective construction type for a building's height, area, and occupancy

What materials are permitted for walls, floors, and roofs in each IBC construction type?

While IBC Table 601 dictates fire-resistance ratings, IBC Chapter 6 also defines which materials are permitted, focusing on the distinction between combustible and non-combustible.

  • Types I and II (Non-Combustible): All structural elements—walls, floors, roofs—must be of non-combustible materials like steel, concrete, and masonry. However, the code does not forbid all combustibles. IBC Section 603 provides a list of exceptions where combustible materials are allowed, such as:
    • Fire-retardant-treated wood (FRTW) for non-bearing partitions and roof construction under certain conditions.
    • Thermal and acoustical insulation (provided it meets specific flame spread and smoke development criteria).
    • Combustible exterior wall coverings and veneers, subject to height limits and testing requirements (e.g., NFPA 285).
  • Type III (Ordinary): This type is a hybrid. Exterior walls must be of non-combustible materials (or FRTW in some cases for Type III-B). The interior building elements, including floors, roofs, and framing, are permitted to be of wood or any other combustible material. The primary difference between III-A and III-B is that III-A requires 1-hour ratings on the interior wood structure, while III-B is unprotected.
  • Type IV (Heavy Timber): The structure is wood, but it must meet minimum dimensional criteria. Combustible materials are permitted, but they cannot be concealed within assemblies. The intent is for the large wood members to be exposed so they can form a protective char layer in a fire.
  • Type V (Wood Frame): All structural elements can be of any material permitted by the code, which functionally means wood framing.

A common point of confusion is using wood studs for interior non-bearing walls in a Type II-B building. While the primary structure must be non-combustible, the code often permits FRTW for these partitions. However, if that partition is also a required rated wall, such as a corridor wall, the entire rated assembly must meet specific testing criteria.

Read more about  materials that are permitted for walls, floors, and roofs in each IBC construction type

What are the IBC requirements for designing a wood-frame building over a concrete podium?

This popular mixed-construction design, often seen in 5-over-1 or 5-over-2 mid-rise residential buildings, is explicitly permitted by IBC Section 510.2. This section allows a building of a lighter, often combustible construction type (like Type V-A or III-A) to be built on top of a more fire-resistive "podium" (Type I-A) as if they were two separate buildings stacked vertically.

The key requirements for this design are:

  • The Podium Construction: The lower portion (the podium) must be of Type I-A construction. This typically houses parking, retail (Group M), or office space.
  • The Horizontal Separation: A 3-hour fire-rated horizontal assembly is required between the podium and the construction above. This robust separation is critical and acts as a fire-rated "ground plane" for the building above it.
  • Continuity of the Separation: This horizontal assembly must be continuous and extend to the outer edge of the building. Any openings or penetrations through it (for stairs, elevators, or MEP systems) must be protected with appropriately rated shafts.
  • Height and Area Calculations: The building above the horizontal assembly is treated as a separate and distinct building for the purposes of calculating its allowable height and area. Its height is measured from the top of the podium, not from the ground.

This approach offers a significant design advantage. It allows designers to leverage the cost-effectiveness of wood-frame construction for residential units while providing a durable, non-combustible base for parking and commercial uses at street level. However, the detailing of the 3-hour separation, especially at the exterior wall line and around windows at the podium level, is a critical life-safety element that receives close scrutiny during plan review and inspection.

Read more about what are the IBC requirements for designing a wood-frame building over a concrete podium

What are the minimum member sizes and material requirements for Type IV Heavy Timber (HT) construction?

Type IV-HT (Heavy Timber) construction achieves its fire resistance not through encapsulation (like gypsum board), but through the use of massive wood members that are slow to ignite and char at a predictable rate. This char layer insulates the remaining wood, allowing the member to retain significant structural capacity for a longer duration in a fire.

To qualify as Type IV-HT, the wood elements must meet the minimum nominal dimensions specified in IBC Section 2304.11:

Building Element

Minimum Nominal Dimension

Columns

8x8 inches (supporting floor), 6x8 inches (supporting roof)

Floor Beams & Girders

6x10 inches

Roof Beams & Girders

6x6 inches

Floor Decking

3 inches thick (splined or T&G) or 4 inches thick (laminated)

Roof Decking

2 inches thick (splined or T&G) or 3 inches thick (laminated)

A critical requirement of Type IV-HT is that the timber elements must generally remain exposed. The code severely restricts the concealment of combustible spaces. This means MEP systems (ducts, pipes, conduit) cannot be hidden inside framed walls or ceilings. They must be run in the open or within shafts enclosed by appropriately rated materials. While gypsum board can be used for shafts, its use as a general wall or ceiling finish can violate the intent of the construction type if it creates concealed combustible spaces.

Read more about the minimum member sizes and material requirements for Type IV Heavy Timber (HT) construction

How do you determine construction type requirements for an addition to an existing building?

When adding to an existing building, the International Existing Building Code (IEBC) provides several compliance paths, but the core issue regarding construction type is whether the addition and existing building will be treated as a single structure or as two separate ones.

There are two primary approaches:

  1. Treat as a Single Building: If the addition is not separated from the existing building by a fire wall, the entire combined structure must comply with the IBC's height and area limitations for its given construction type and occupancy. This can be problematic if the existing building is already at its limit. For example, adding a Type V-A addition to an existing Type V-A building could push the total floor area over the allowable limit, potentially triggering a requirement to add sprinklers or upgrade the construction type of the entire facility, which is often infeasible.
  2. Separate with a Fire Wall: A more common strategy is to separate the addition from the existing building with a proper fire wall that meets the requirements of IBC Section 706. A fire wall is a structurally independent, fire-rated wall that extends from the foundation to the roof. This allows the addition to be considered a separate building for code purposes. Each "building" can then have its own construction type and must independently comply with height and area limits. For example, a new Type V-A addition can be built next to an existing Type III-B building, provided a 2- or 3-hour fire wall separates them.

Determining the construction type of an old building can be a challenge. It often requires reviewing original construction documents (if available), consulting with a structural engineer or architect, and sometimes performing selective demolition to observe the structural system and materials.

Read more about how you determine construction type requirements for an addition to an existing building

How Different Codes and Standards Interact

The IBC sets the primary requirements for construction type, but it doesn't operate in a vacuum. Numerous other codes and standards influence the design and are impacted by the initial classification.

  • NFPA 13 (Standard for the Installation of Sprinkler Systems): As mentioned, installing an automatic sprinkler system is the single most significant way to gain increases in allowable height and area. The IBC explicitly rewards the added safety of sprinklers by allowing larger buildings for a given construction type.
  • International Fire Code (IFC): The IFC manages fire department access, and the required frontage for area increases in the IBC is directly related to ensuring adequate access for firefighting operations.
  • International Energy Conservation Code (IECC): The IECC dictates requirements for insulation and air sealing. These requirements must be coordinated with the construction type. For example, the type and placement of combustible foam plastic insulation may be more restricted in a Type I or II building than in a Type V building. The insulation must be installed without compromising the integrity of a required fire-resistance-rated assembly.
  • Accessibility Standards (ADA & ANSI A117.1): While not directly tied to construction type, these standards impact the design of the building, which is built according to its classification. The structural system chosen to meet the construction type requirements must also be able to accommodate accessibility features like ramp slopes, elevator shafts, and clear floor spaces without compromise.

Common Design and Coordination Mistakes

Navigating the nuances of construction types can lead to common errors during design and plan review. Avoiding these pitfalls early can save significant time and money.

  • Misunderstanding "Protected" vs. "Unprotected": Assuming a Type II-A building is superior in all ways to a Type III-A building. While II-A is non-combustible, both require 1-hour ratings on their frames. The best choice depends on cost, materials, and project goals.
  • Forgetting about Combustible Material Limits in "Non-Combustible" Types: Specifying combustible insulation, millwork, or exterior veneers in a Type I or II building without verifying they meet the exceptions in IBC Section 603 can lead to costly rework.
  • Improper Podium Separation Detailing: The 3-hour horizontal separation in a podium building is a critical life-safety feature. Failing to carry it to the exterior wall line or improperly protecting penetrations is a frequent reason for plan rejection or failed inspections.
  • Ignoring Jurisdictional Amendments: The IBC is a model code. States and local jurisdictions can (and do) amend it. For example, areas in the Wildland-Urban Interface (WUI) in California may have much stricter requirements for exterior materials on Type V buildings than the base IBC. Always check for local amendments.
  • Confusing Fire Partitions with Fire Walls: When planning an addition, using a less-robust fire partition or fire barrier where a true, structurally independent fire wall is needed to legally separate two buildings is a critical error.

The Impact on Permitting and Plan Review

The construction type classification is one of the first things a plan reviewer verifies. It forms the basis for their entire review of the project's compliance with height, area, egress, and fire-safety provisions.

During plan review, expect the examiner to check:

  1. Code Data Block: Ensure the construction type, occupancy, sprinkler status, and allowable vs. actual height and area calculations are clearly stated on the cover sheet.
  2. Wall, Floor, and Roof Assemblies: They will cross-reference your assembly details with the requirements in IBC Table 601 and ensure the specified UL or other tested assembly numbers match the required rating.
  3. Material Specifications: They will check that materials comply with the combustible/non-combustible requirements of Chapter 6. For example, they will look for FRTW certificates or NFPA 285 compliance for exterior walls when required.
  4. Structural Drawings: The primary structural system shown on the S-sheets must be consistent with the claimed construction type on the A-sheets.

Getting the construction type right from the beginning and clearly documenting compliance is the key to a smoother, faster permitting process.

Frequently Asked Questions

What is the fundamental difference between "protected" (Type A) and "unprotected" (Type B) construction? The "A" designation means that the building's primary structural elements (frame, floors, etc.) must be protected to achieve a specific fire-resistance rating, typically 1 hour. This is usually done by enclosing them in rated gypsum board or applying a fire-resistive material like spray-on fireproofing. The "B" designation means these same elements are permitted to be left unprotected, even if they are made of non-combustible materials like steel.

Does adding sprinklers to my building change its construction type? No. Adding an NFPA 13 automatic sprinkler system does not change a building's classification (e.g., from Type V-A to Type III-A). However, it does provide significant benefits by allowing for major increases in the building's allowable height and floor area under IBC Chapter 5. It can also lead to other code trade-offs, like reduced corridor ratings.

Can I mix construction types in one building without a fire wall? Generally, no. A building must be classified as a single construction type. If you have different types of construction within the same structure, the code requires you to classify the entire building according to the least fire-resistive type present. The two major exceptions are podium buildings (per IBC 510.2) and separating the different areas with a true fire wall, effectively creating two separate buildings.

How do I find out the construction type of an existing building? This can require some investigation. The best sources are the original construction drawings filed with the local building department. If those are unavailable, a licensed architect or engineer can perform a site survey to identify the primary structural materials and assemblies (e.g., wood frame vs. steel, protected vs. unprotected) to make a determination.

Is there a "best" or "cheapest" construction type? No. The "best" type is the one that most efficiently and safely meets the project's specific goals for size, use, and budget. Type V-B is the least expensive per square foot but is the most limited in size. Type I-A is the most robust and allows for the largest buildings, but it is also the most expensive. The design process is about finding the optimal balance between these factors.

Why is construction type one of the very first decisions in a project? Because it fundamentally constrains the building's potential size and form. Before an architect can even begin massing studies, they need to know if the client's program can fit on the site within the height and area limits of an economically viable construction type. This decision drives the structural system, material palette, and overall project budget from day one.

AI assistant for code research & compliance

AI-powered Takeoff Service

Follow us

This content is for informational purposes only, based on publicly available sources. It is not official guidance. For any building or compliance decisions, consult the appropriate authorities or licensed professionals.

Your AI-assistant for code research

AI-powered Takeoff Service

Interface with dropdown menus for selecting code categories, jurisdiction, and year above a search bar containing a fire safety question about non-sprinklered Group I-2 occupancy with a laundry room over 100 square feet.List of features with check marks: 2D / 3D / Conceptual, Upfront Pricing, Fast & Guaranteed Turnaround Time, Estimators with 15+ year experience.