Customer story · AI-Enabled Takeoff & Estimating Service

MicroEstimating Replaced Traditional Outsourcing With 3x Faster Estimates and Unmatched Detail

Traditional outsourcing was delivering late, shallow estimates that couldn't be defended in front of clients. MeltPlan's team changed the equation: faster turnaround, deeper detail across every CSI division, and documented assumptions that gave their clients confidence in every number.

Henry Tooryani, MicroEstimating
Henry Tooryani Principal & Founder, MicroEstimating Inc.
3x
Faster turnaround on
takeoffs and estimates
30%
More projects
taken on per quarter
4/mo
Projects estimated
$50M+/mo
Total estimated
project value

MeltPlan feels like part of our estimating team. They get accurate takeoffs back to us quickly, fully quantify the drawings, and point out scope gaps. It’s AI-assisted, but reviewed by estimators with decades of real building experience who stand behind the numbers and are easy to reach. We are able to confidently provide our customers with thorough estimates.

Henry Tooryani
Principal / Founder
MicroEstimating Inc.
About MicroEstimating

A Bay Area estimating and construction management firm with a national client base

MicroEstimating Inc. (DBA MEI Group Inc.) is a San Francisco-based construction cost estimating and consulting firm founded by Henry Tooryani. Their services span preconstruction estimating, project management, cost management, and constructibility reviews across public works, healthcare, transportation, higher education, K-12, residential, and commercial projects. Henry also teaches Construction Management and Estimating at UC Berkeley and mentors students at Stanford's AEC Global Teamwork Program.

Their client list includes the City and County of San Francisco, UCSF Medical Center, Kaiser Permanente, SFO Airport, San Jose Airport, SFUSD, Children's Hospital, Swinerton, and others. The work is high-stakes: estimates need to be accurate, defensible, and delivered on the timeline their clients are bidding against.

When project volumes outpaced their in-house capacity, they outsourced. That's when things broke.

Featured project
ProjectCollege of Alameda
Aviation Campus
ClientPeralta Community
College District
Building A gross area19,700 sf
Site area97,949 sf
Estimate basis100% DSA submittal
Total construction cost$29.3M
Total engagement8+ projects, $200M+
Stages coveredSD, DD, CD 95%, CD 100%
The challenge

The outsourced estimates were damaging client relationships

MicroEstimating needed overflow capacity. What they got back from traditional outsourcing created three new problems.

Turnaround too slow

Estimates arrived after their clients' bid deadlines had passed. MicroEstimating was missing delivery windows, and their contractors were losing work because of it.

Quantity dumps, not real estimates

What came back was raw numbers with no backing. No assumptions, no qualifications, no explanation of how anything was derived. A data dump, not a deliverable.

Client trust eroding

When MicroEstimating presented these thin estimates to their clients, there was nothing to defend. Repeat work and long-term relationships were at risk.

The solution

Estimators who've built what you're pricing, backed by AI that moves at project speed

Henry connected with Tanmaya Kala, Co-Founder of MeltPlan. The difference from every other outsourcing firm was obvious in the first deliverable.

MeltPlan's estimators have decades of U.S. project experience, from small commercial through multi-billion-dollar programs, and many have worked as general contractors themselves. They don't just count quantities. They understand how an estimate gets used downstream: to price a project, negotiate scope, and defend numbers to an owner.

Behind that experience sits proprietary AI that handles the volume work at 10x speed: takeoff extraction, quantity verification, unit cost assembly. Estimators focus on judgment, QC, and the construction intelligence that no model replaces.

Henry tested with one project: Peralta Community College District, Aviation Campus. Eight more followed.

AI-accelerated, human-verified

Proprietary AI accelerates takeoffs and quantity extraction. Experienced estimators review every number before delivery.

GC-level construction intelligence

Estimators who've worked as general contractors bring constructability awareness that typical services miss entirely.

Full-spectrum deliverables

CSI-structured trade breakdowns, detailed line items, qualifications, exclusions, and assumptions. Not quantity dumps..

Scope gap identification

MeltPlan proactively flags missing specs and design ambiguities, catching issues before they become cost surprises.

Snapshot of the final deliverable

What a MeltPlan estimate actually looks like

Every MeltPlan estimate follows the same rigorous structure: quantities measured from the drawings, composite unit pricing on every line item, a full CSI division breakdown, and documented qualifications and exclusions. The Aviation Campus Building A estimate shows the standard at work.

Grand summary: full cost roll-up
Building A direct cost$15,096,325
Siteworks direct cost$6,697,199
Design contingency (5%)$1,089,676
GC general conditions (10%)$2,288,320
Overhead / fee (4%)$1,006,861
Bond and insurance (2%)$523,568
Escalation to mid-point (9.8%)$2,616,791
Total construction cost$29,318,739
CSI division summary: cost by division
Div 02: Existing conditions$525,501
Div 03: Concrete$1,281,858
Div 04: Masonry$479,902
Div 05: Metals$3,111,532
Div 06: Wood and plastics$359,090
Div 07: Thermal and moisture protection$1,955,231
Div 08: Openings$1,092,423
Div 09: Finishes$1,593,676
Div 10: Specialties$276,754
Div 12: Furnishings$142,659
Div 14: Conveying systems$230,000
Div 21: Fire suppression$341,303
Div 22: Plumbing$1,096,708
Div 23: HVAC$1,266,138
Div 26: Electrical$1,927,338
Div 27: Communications$239,564
Div 28: Electronic safety and security$622,472
Div 31: Earthwork$544,315
Div 32: Exterior improvements$4,301,553
Div 33: Utilities$405,506
Subtotal direct cost$21,793,524
Trade breakdown: Div 05 Metals
05 10 00: Structural steel framing$2,274,889
05 31 00: Steel decking$275,609
05 51 00: Metal stairs$215,000
05 43 00: Slotted channel framing$4,973
05 50 00: Metal fabrications$150,251
05 51 33: Metal ladders$5,750
05 52 13: Pipe and tube railings$185,060
Division 05: Metals total$3,111,532
CSI detail: structural steel framing (sample)
W14x132 columns (22 ea, H=23'-8")$198,706
W14x68 roof beams (1,087 lf)$212,577
HSS10x0.500 vertical bracing (219 lf)$41,734
HSS8x8x3/8 horizontal bracing (703 lf)$102,601
Canopy framing, galvanized steel$110,422
G90 galvanizing premium$200,000
Detailing, connections, hardware$361,256
Div 05: Metals total$3,111,532

Showing 7 of 50+ line items in structural steel alone. Full detail estimate runs to 22 pages.

Qualifications and assumptions
Basis of estimate100% DSA + 100% CD specs
Labor rate basisPrevailing wage, Alameda County
Delivery methodDesign-bid-build, 3+ bids
Escalation methodology9.8% to construction mid-point
Named exclusions13 items explicitly listed
Named allowances4 items with $ values
Construction scheduleSingle phase, regular hours
Quantity basisActual measurement + parametric
Unit pricing basisComposite (material + labor + equip + markups)

Actual pages from the estimate

Snapshots from the Alameda Aviation Campus Building A deliverable, showing the depth and structure of a MeltPlan estimate in practice.

View full detailed estimate
Snapshot of the final deliverable

Every quantity traced back to the drawing

MeltPlan delivers color-coded takeoff markups alongside every estimate, with each element counted and measured directly on the construction documents. Below is a sample from the Alameda Aviation Campus project. The full set covers every discipline and every sheet.

View takeoff markups
The engagement at scale

One test project. Then eight more.

The Aviation Campus estimate was a trial. Within months, MicroEstimating was routing projects across SD, DD, and CD stages, totaling over $200M in total estimated value.

4/mo
Projects estimated
50K+/mo
Building sf estimated
85K+/mo
Site sf estimated
$50M+/mo
Total estimated value
5
Project stages covered

Detailed estimates, delivered fast

Estimating services firms, GCs scaling preconstruction, owners needing independent cost validation. Same team, same rigor, same speed.

Book a Meeting