Railing

A barrier of posts, rails and infill along stairs, decks and open edges.

Quick Answer

A railing is a barrier made of posts, a top rail and usually infill such as balusters, cable or glass, installed along stairs, balconies, decks and other open edges. A balustrade is the same assembly, named for its row of balusters. Estimators count railings by the linear foot, with posts and special parts as separate counts.

The Full Picture

A railing is a bundle of parts, not a single material. Posts anchor it to the structure, a top rail forms the graspable or protective edge, and infill (balusters, pickets, cable, glass or panels) closes the gap below. A balustrade is the traditional name for the baluster-and-rail version, and the word shows up in older specifications and on historic or high-end residential drawings. Railings can be wood, steel, aluminum or glass, and many real railings mix materials, for example a steel post with a wood cap rail.

Where it sits in the assembly depends on the item. Stair railings run along the stringer or the open edge of a landing. Balcony and deck railings attach to the rim joist, to blocking set inside the framing, or to the slab edge. Because the load goes into that structure, the framing takeoff has to include the blocking or backing the railing needs. That blocking is easy to leave out because it is drawn only in a wall or deck section. The OSHA construction rule for temporary guardrails, 29 CFR 1926.502, gives an idea of the loads involved: top-edge height of 42 inches plus or minus 3 inches and a 200-pound test force. Permanent railings follow the building code and the drawings instead.

The unit is almost always linear feet (LF), measured along the centerline of the top rail from the plans, elevations and the stair or railing details. Posts are carried by the each (EA), and corners, end caps, gates, wall brackets and returns are separate counts because they cost more than a straight run. Wood railing parts may be carried as MBF only when the estimator is pricing the lumber in a site-built rail. Glass or cable infill is often priced per LF of panel or per square foot. Stair rail runs on a slope, so the length is the sloped length, not the plan length. The sloped figure is longer, and using the plan length shortchanges the run.

Pricing mistakes tend to be scope mistakes. A railing that appears on an elevation may be furnished by a metals subcontractor, a millwork shop or the framing carpenter, and each assumes another is carrying it. The finish, such as paint, stain or powder coat, is often missed, and so is the second handrail required on some stairs. Reading the specification section and the general notes tells you who carries what. Estimating teams should settle those assignments before the numbers are final.

Real Examples

→Worked takeoff: deck railing: A deck has open edges on three sides measuring 14 ft, 9 ft and 9 ft. The railing run is 14 + 9 + 9 = 32 LF. With posts at no more than 6 ft on center, the 14 ft side needs 3 bays (14 / 6 = 2.33, rounded up), and each 9 ft side needs 2 bays, so there are 3 + 2 + 2 = 7 bays. An open run with two ends has one more post than it has bays, so 8 posts. The estimate carries 32 LF of railing and 8 posts, with the blocking carried in the framing.
→Sloped stair run: A stair rises 105 in over a 140 in horizontal run. The sloped length is the square root of (105 squared plus 140 squared), which is 175 in, or about 14.6 ft. Takeoff from the plan view alone would give 140 in, about 11.7 ft, so the stair railing would be priced short by roughly 2.9 ft per side.
→Mixed-material rail: An elevation shows a steel post with a wood cap and glass infill. The estimator splits the line: posts EA to the metals trade, cap rail LF to millwork, and glass panels by area or LF to the glazing sub, so each scope is covered once and none is dropped.

Common Misconceptions

People assume: A railing and a handrail are the same thing.

Actually: A handrail is the graspable rail along a stair or ramp. A railing, or guardrail, is a barrier along an open edge. Some stairs need both, and OSHA's stair rule treats stairrails and handrails as separate parts of the system. The takeoff should carry them as separate lines.

People assume: A railing is quantified by plan length.

Actually: Sloped railings on stairs and ramps run longer than their plan view, and returns, corners and end posts add to the count. Measure along the sloped centerline and count the special parts separately.

People assume: The railing price covers its blocking and finish.

Actually: Backing in the framing, anchors, paint, stain and powder coat are usually separate scope items. Check which trade carries each before closing the number.

Does MeltPlan Solve This?

Partially — adjacent

Railing runs, post counts and stair lengths are measured from the plan sheets, elevations and details. MeltPlan's takeoff service applies to that work: AI pulls quantities from plans and US-based experienced estimators review and adjust them. Deciding which trade carries the railing, its finish and its blocking stays with your estimating team.

Get railing lengths and counts measured from your plans →

Frequently Asked Questions

How is a railing measured for a takeoff?

Along the centerline of the top rail in linear feet, using the sloped length on stairs and ramps. Posts, corners, gates, end caps and returns are counted each, because they are priced differently from a straight run.

What is the difference between a railing and a balustrade?

A balustrade is a railing whose infill is a row of balusters topped by a rail. In practice the words overlap, and estimators carry both as LF of railing plus a count of posts or newels.

What height does a railing have to be?

It depends on the code and the setting. For temporary guardrails on jobsites, OSHA 1926.502 sets the top edge at 42 inches plus or minus 3 inches. Permanent railings are governed by the adopted building code and the drawings, so read the sheets for the required height.

Which drawings show railings?

Plans show the run, elevations show the style and height, and railing details show post anchorage and infill. The specification divisions that cover metals, wood and glass often hold the finish and performance requirements.

Related Terms

More Takeoff & Estimating — Wood, Framing & Millwork Terms

Sources

  1. 29 CFR 1926.502: Fall protection systems criteria and practices (Cornell LII)
  2. 29 CFR 1926.1052: Stairways (Cornell LII)