Takeoff & Estimating — Concrete, Sitework & Utilities

Bulb Tee

A precast prestressed girder shaped like a T with a bottom bulb.

Quick Answer

A bulb tee is a precast, prestressed concrete girder with a top flange, a thin web and an enlarged bottom flange, the bulb, that holds the prestressing strands. It is cast in a plant and shipped to site, mainly for bridges. Estimators typically count it by piece and by length.

The Full Picture

A bulb tee gets its name from its cross-section: a wide top flange that works with the deck, a slender web, and a thickened bottom flange that holds the prestressing strands. Casting it in a plant lets the producer tension the strands and control curing, which is why bulb tees can span farther than a conventionally reinforced beam of similar depth. They are a form of precast, prestressed concrete.

Bulb tees come in standardized depths, and bridge owners commonly specify shapes from the AASHTO/PCI family, with the depth in the shape name. Each state DOT also publishes its own standard sections, so the shape on the drawings controls. Precast girder units are built outside traffic areas and shipped to the site, which is why bridge schedules favor them.

For takeoff, the primary unit is each piece, with length in LF shown beside it because the producer's price is driven by length, strand pattern and shape. A concrete CY quantity can be computed from the cross-section area and length when it is needed for a cross-check, but suppliers quote per piece or per LF. Erection is a separate item: crane or launching equipment, falsework or bracing, bearing pads, diaphragms and the cast-in-place deck. Those are usually carried by different trades or line items.

The documents to read are the structural framing plan, the girder schedule and the beam details, plus the precast concrete specification section in Division 03. Look for camber, end-block details, lifting and sweep tolerances, and shipping limits. Piece weight and length matter because they limit hauling routes and crane capacity.

Pricing pitfalls include counting girders at the span length instead of the fabricated length, missing skewed ends or special strand layouts that change the price, forgetting escort or oversize haul costs, and leaving crane mobilization and temporary works out of the number. Because lead times are long, the estimate should also note when the precaster needs shop drawing approval.

Real Examples

→Worked girder count: A bridge has 6 girder lines in each of 3 spans, each span 110 ft long. That is 6 x 3 = 18 pieces and 18 x 110 = 1,980 LF of bulb tee. If the producer quotes by piece, 18 EA is the price basis. If it quotes by LF, 1,980 LF is, and the estimator checks the fabricated length against the plans.
→Deck kept separate: An overpass uses bulb tees under a cast-in-place deck. The takeoff lists each girder by mark, quantity and length, and keeps deck concrete and rebar as separate CY and ton items.
→Erection scope gap: The precast supplier's quote is delivered to the site only. The estimator adds crane, bearing pads, bracing and the diaphragm concrete so that erection is not left unpriced.

Common Misconceptions

People assume: A bulb tee is the same as a double tee.

Actually: A double tee has two stems and a wide flange used as floor or roof deck. A bulb tee has one web and a bottom bulb, and it is used as a beam or girder.

People assume: The precaster's price includes installing it.

Actually: Quotes frequently cover furnishing and delivery only. Erection, bearing pads, grouting and the deck often belong to other scopes.

Does MeltPlan Solve This?

Partially — adjacent

Counting the girders and lengths shown on structural plans is a takeoff task. MeltPlan's takeoff service combines AI that pulls quantities from plans with US-based experienced estimators who review and adjust them, so the output is a verified, ready-to-use takeoff. It works from PDF plans, not BIM models.

Get precast girder counts and lengths pulled from the plans →

Frequently Asked Questions

What does a bulb tee look like?

In cross-section it resembles a T: a wide top flange, a thin vertical web and a widened bottom flange (the bulb) that holds the prestressing strands.

How is a bulb tee measured in a takeoff?

Typically by piece (EA) with length in LF, listed by mark from the girder schedule. Concrete volume in CY is a cross-check, not usually the pricing basis.

Is a bulb tee used only for bridges?

Bridges are the main use, but similar prestressed shapes can appear in long-span buildings and parking structures where depth and span suit the project.

What should be priced besides the girders?

Transportation, crane or launching equipment, temporary bracing, bearing pads, diaphragms, deck forming and reinforcement. Several of these are in other trades' scopes, so scope gaps are common.

Where is a bulb tee specified?

In the structural plans (framing plan, girder schedule, details) and the Division 03 precast specification. State DOT standard sections may also be referenced for bridges.

Related Terms

More Takeoff & Estimating — Concrete, Sitework & Utilities Terms

Sources

  1. FHWA — Prefabricated Bridge Elements and Systems: Girder Units
  2. FHWA — Accelerated Bridge Construction / Prefabricated Bridge Elements and Systems

Automate quantity takeoffs with AI

Fill in the details and our team will reach out.

Contact us today

Automate quantity takeoffs with AI

MELTPLAN